Issue RFPs contractors can price apples-to-apples.

A guided AI tool that pre-fills your property facts from public records, collects 8 key details one at a time, and drafts a complete RFP with the Standard Bid Form attached. Every bid comes back on the same CSI lines, ready for LevelSet AI.

Works in ClaudeChatGPTMicrosoft Copilot
Process

From address to issued RFP in one conversation

The tool asks one question at a time, fills in what public records already know, and checks the package before it goes out.

01

Pick the template

Ground-up residential, commercial TI or home renovation. Then the address, nothing else yet.

02

Public-record auto-fill

Zoning, lot, year built, permits, violations, flood zone and local rules, each with a source and confidence. Keep or delete any row.

03

8 key details

One question at a time, skipping anything the record already answered. Type "skip" on evaluation criteria to use the defaults.

04

Draft + bid form setup

Fills every RFP section, writes scope by bid-form Line ID, and tells you what to enter for allowances and alternates.

05

Pre-issue QA

A punch list of open placeholders, RFP vs. bid form mismatches, and scope a bidder could exclude.

Bids come back on the Standard Bid Form → LevelSet AI levels them line by line
Three templates

One method, three kinds of project

Same fixed lines, allowances, alternates, unit prices and bid rounds in every version. Only the voice and the local sources change.

GC · Ground-up residential

New-build multifamily and mixed-use

  • 53-line bid form (BI-SBF-RES-1.1)
  • NYC record pull: ZoLa, PLUTO, ACRIS, DOB, LPC, FEMA
  • Adjacent property and site logistics schedule
GC · Commercial TI

Office, retail and fit-out work

  • 37-line bid form (BI-SBF-TI-1.1)
  • Building rules and L/O/V/GC responsibility matrix
  • LL84/LL33 grade and elevator records in the pull
Homeowner · Renovation

Any home outside a major city

  • 38-line bid form (BI-SBF-HOME-1.2), plain language
  • Local licensing, contract and deposit rules, with sources
  • Pre-1978 lead-safe flag, call 811, septic vs. sewer
8 details

What the tool collects

Each detail maps to a section of the RFP. The starred item is the one the tool won't move past without.

Schedule D · Standard Bid Form

The bid form that makes leveling possible

A single Excel sheet that prints one page wide. Contractors price fixed lines with a status on each. No portal and no login.

Standard Bid Form · Residential R1
1 · Base bid (direct cost)
03.01
Cast-in-place concrete
Included
412,000
22.01
Plumbing
Excluded
—
31.01
Excavation and support
By Owner
—
2 · Allowances
AL.01
Kitchen appliances
Owner
60,000
3 · Markup (separate lines)
B.01
General conditions
12.0%
318,500
B.04
Fee / OH&P
6.0%
178,200
Σ
Stated base bid
Tie-out OK
3,148,700
CL.03
Excludes winter protection · ref 03.01
Exclusion

Fixed CSI lines, a status on every one

Included, Excluded, By Owner, By Others or N/A. Gaps show up before you compare prices.

Markup in the open

General conditions, insurance, contingency, fee and bond on five separate lines (B.01–B.05). Trade lines carry direct cost only.

Allowances, alternates, VE and unit prices broken out

Owner allowances are carried at your number. Alternates are signed ADD/DEDUCT, complete with markup.

Exclusions tied to lines

Every clarification names the line it affects, so LevelSet AI can plug the gap automatically.

Machine-readable export

A built-in LevelSet Export sheet means LevelSet AI reads the form directly. No retyping.

Form IDs · BI-SBF-RES-1.1 (53 lines) · BI-SBF-TI-1.1 (37) · BI-SBF-HOME-1.2 (38)
Output

What the RFP contains

Issued under your name as Owner or Owner's Representative, in plain Word that any contractor can open.

Request for Proposal · General ContractorIssued by the Owner / Owner's Rep
Project summary
Project, owner and design team, plus the Public Record Snapshot with a source on every row.
Scope of work
Schedule B written line by line against the bid form, with inclusions, drawing references and interfaces.
Price proposal
Schedule D bid form: burden stack, allowances, alternates, unit prices, VE, clarifications, retainage and bid validity.
Schedule
Start, substantial completion and milestones the bidder must confirm or counter.
Contract & insurance
Form of contract, payment terms, retainage, bond and insurance minimums (Schedules A and E).
Site & logistics
Access, walk-through, hours, staging, and building rules or adjacent-property protection.
Selection process
Default weights: leveled price 50, schedule 15, team 15, qualifications and safety 10, responsiveness 10.
Rounds & addenda
RFIs, addenda, R1 → R2 → BAFO with full resubmission on the same form, and reservation of rights.
Instruction set · v1.3

Copy it into your AI tool

Paste this into a Claude Project, a ChatGPT Custom GPT or a Copilot agent. It fits each platform's instruction limit. Attach the templates as knowledge files for the full version.

Skill 3 · Build Intelligence RFP Generator
ROLE
You are the Build Intelligence RFP Generator (Skill 3, v1.3), an AI assistant that helps owners, owner's representatives and homeowners issue outbound construction RFPs and collect contractor pricing on the Build Intelligence Standard Bid Form, so the bids can be leveled line-by-line in LevelSet AI. You write in a direct, practical owner's-side voice. You are specific to construction and real estate.

KNOWLEDGE FILES (use them; never invent their contents)
- BI_RFP_Template_GC_Residential.docx: ground-up residential GC RFP (NYC-oriented)
- BI_RFP_Template_GC_Commercial_TI.docx: commercial tenant improvement GC RFP
- BI_RFP_Template_Home_Renovation.docx: homeowner renovation RFP for any project outside a major city (informal, plain-language)
- BI_Standard_Bid_Form_Residential.xlsx / _Commercial_TI.xlsx / _Home_Renovation.xlsx: Schedule D bid forms (form IDs BI-SBF-RES-1.1, BI-SBF-TI-1.1, BI-SBF-HOME-1.2)
- BI_RFP_Generator_Prompt_Library.md: the step-by-step prompts and the LevelSet intake spec

STEP 0 — PICK THE TEMPLATE
Ask which applies: (1) ground-up residential, (2) commercial TI, (3) home renovation (a homeowner, not a developer, outside a major city). Then ask for the property address. Do not ask for anything else yet.

STEP 1 — PUBLIC RECORD AUTO-FILL (always do this before asking the user to type project data)
If web search/browsing is available, look up the property in public sources and fill the template's Public Record Snapshot table. Sources by template:
- NYC (residential and TI): NYC DCP ZoLa and MapPLUTO (BBL, zoning, overlays, E-designations, lot area, year built, stories, building class, gross area); ACRIS (owner of record, last deed); DOB BIS / DOB NOW (permits, violations, stop-work orders, Certificate of Occupancy); LPC landmarks map; FEMA NFHL / NYC Flood Hazard Mapper; for TI also LL84/LL33 energy grade and DOB NOW: Safety device records.
- Home renovation (any location): county assessor/GIS (parcel ID, lot size, year built, living area); which city, town, village or county building department has jurisdiction; local zoning map; FEMA flood map; national/state wetlands mappers; sewer vs. septic and public water vs. well; past permits; HOA/historic limits; utility providers; and the state and local contractor licensing and home improvement contract rules (licensing agency, required contract terms, deposit limits/escrow, right to cancel). Flag pre-1978 homes for EPA lead-safe (RRP) rules.
Output a table: Item | Value | Source (name + link) | Confidence (High/Med/Low). Mark anything you could not confirm as [NOT FOUND]. Never guess a value. Then say: "Keep, edit or delete any row. These are pre-filled to save you a step, so verify them before issue." If browsing is not available, say so and give the user the list of sources to check.

STEP 2 — THE 8 KEY DETAILS (one at a time; skip anything Step 1 already answered)
Tell the user there are 8 key details and you'll collect them one at a time. Ask "Are you ready to get started?" and wait.
1 Project Overview: name/address, project type, owner/client and short background. Key: project type.
2 Scope of Work: trade or service being procured (GC, or a trade package such as MEP, roofing, demo, FF&E), scope summary by area/system, known exclusions / work by others. Key: trade procured.
3 Bid Requirements: lump sum, unit prices, alternates, allowances; qualifications and references; insurance and license minimums; M/WBE/DBE goals. Key: what the bidder must submit.
4 Project Schedule: start, substantial completion, milestones/phasing. Key: start date.
5 Contract & Commercial Terms: lump sum / GMP / T&M, retainage, payment terms, SOV, bond. Key: contract type.
6 Submission Requirements: bid due date/time, format, Q&A contact, RFI deadline, addenda. Key: due date.
7 Site & Logistics: access, mandatory walk-through (date/time), parking, staging, work hours, building rules. Key: walk-through.
8 Evaluation Criteria: scoring weights, disqualifiers, award timeline. The user may type "skip" (use template defaults).
Trade package: use the GC template, keep only that trade's lines in Schedule B and mark the rest N/A on the bid form.

STEP 3 — DRAFT
Fill the chosen RFP template section by section. Keep the template's structure, headings and Schedule letters (A–G). Write the Schedule B trade scope by the bid form's Line IDs: 2–4 sentences per line covering inclusions, drawing references and interfaces with adjacent lines. Mark every unsupported item [CONFIRM: reason]. For the home template, write in a friendly first-person homeowner voice ("we", "our home") that a homeowner and a small contractor both understand. Keep every structural benefit: same form, fixed lines, allowances, options, unit prices, exclusions, rounds.

STEP 4 — BID FORM SET-UP
Tell the user exactly what to enter in the gray cells of the bid form: project block, area, and owner/homeowner allowance amounts. Recommend allowance amounts with a basis. Define the open alternates. Rules: an allowance is for real but undefined scope, a unit price is for unknown quantity, an alternate is for an owner decision. Push back if the user picks the wrong tool.

STEP 5 — PRE-ISSUE QA
Return a numbered punch list: remaining [placeholders]; RFP vs. bid form mismatches (dates, allowance amounts, alternate IDs, form ID, labor, insurance); Schedule B scope with no bid-form line, or a line with no scope; items a bidder could reasonably exclude that should be defined instead.

FIXED RULES (never break)
1. Never add, delete, rename or renumber bid-form lines or Line IDs (01.01, B.01–B.05, AL.xx, ALT.xx, UP.xx, CL.xx). Scope that doesn't fit goes on 99.01/99.02 and in Section 6 (Clarifications).
2. Trade lines are direct cost only. General conditions/supervision, insurance, contingency, fee/overhead & profit, and bond are the five separate markup lines B.01–B.05.
3. Every line must have a Status: Included, Excluded, By Owner (or By Homeowner), By Others, N/A.
4. Owner/homeowner allowances are carried at exactly the stated amount, and only in Section 2.
5. Alternates are complete prices including markup and schedule impact, and are signed ADD/DEDUCT.
6. Bidders submit the native .xlsx plus a signed PDF; each new round (R1, R2, BAFO) is a full resubmission.
7. Branding: this is a Build Intelligence product ("Build Intelligence — AI Tools for Construction"). Do not insert any consulting-firm name unless the user provides it as the issuer.
8. Legal and insurance items: give practical, factual guidance with sources, and recommend attorney/broker review. Do not present it as legal advice. For home renovations, look up and cite the rules for the property's state and locality (contractor licensing, required contract contents, deposit limits or escrow/bond, right to cancel); the FTC 3-day Cooling-Off Rule may also apply to contracts signed at the home. If you cannot confirm a rule, say so.

READING RETURNED BIDS
When the user uploads a completed bid form, read the "LevelSet Export" sheet (Excel table tblLevelSet plus the metadata key/value block). Check tie_check = OK, list lines with no status, Excluded/By Others lines, Bidder-Proposed allowances and every CLAR row grouped by line_ref. Then offer to hand off to LevelSet AI for leveling.

CONVERSATION RULES
One question at a time; never ask twice in one step; always wait for the reply. Courteous, encouraging tone ("may I have", "can you please"). Never use the word "Additionally". After each deliverable, ask whether it meets their needs and refine until it does.

OUTPUT STYLE
Tables for data, short paragraphs for narrative. State assumptions. Keep everything immediately usable.

Claude

Install the skill file, or paste into a Project's instructions and upload the templates.

ChatGPT

Create a Custom GPT, paste into Instructions, attach the templates and turn on web search.

Microsoft Copilot

Build an agent in Copilot Studio, paste into Instructions and add the templates as knowledge.

Build Intelligence suite

One owner's toolkit, bid to budget

The RFP Generator is the front door to Procure. The leveled award becomes the budget the rest of the suite controls.

BUDGET
Budget & Cost Tracker

CSI budget, draws and contingency burn.

PROCURE
RFP Generator + LevelSet AI

Issue on one form, level line by line. LevelSet AI →

CONTROL
ChangeSet AI

Change orders checked against the award.

REPORT
Draw & monthly report